Premortem
Assume the work has failed; look for concrete causes that could lead to it.
- use
- levels
- simple · medium · hard
- links
- 3 related methods
- license
- CC BY 4.0 · View the card’s open source
What is it?
A premortem is treating a plan, before carrying it out, as if it had failed in the future, and writing down the possible causes. It is not a forecast or an account of events that happened, but an exercise in finding the plan's weak points.
When does it help?
When the plan looks ready and it gets harder for team members to voice their reservations, or when you want to see preventable problems early.
Examples
The situations and responses below are fictional teaching examples; they are not results from a model, tool or benchmark that was actually run.
Simple
Situation
You will check the plan for an eight-person workshop.
Prompt
Prompt
Plan: 12 October 14:00, 8 people, materials included. The venue is not yet decided.
Fictional assumption: The workshop did not go well. Write at most three possible causes connected to the current plan. For each cause, propose an early sign and a small precaution. Do not narrate it as if it happened; do not invent budgets or human behavior that are not in the source.Sample output
“If the venue is announced late, participants may not be able to prepare. Early sign: the address still being unclear on announcement day. Precaution: setting a person responsible and a date for the address decision.”
What did we get?
A general worry was tied to an observable sign and a concrete plan.
Medium
Situation
Different team members see the same risk differently.
Prompt
Prompt
Plan: A new usage guide will be published on Friday. The draft is ready; no technical check has been done; one editor is on leave.
Premortem round: First each person should independently write their own three causes of failure. Then the model should group the real notes into similar themes; it should not delete a concrete cause held by a minority.
Sample input A="A wrong command misleads the reader", B="Nobody is left for the final check", C="Code overflows on mobile".
For each theme, separate the available evidence, the check step, and the area where a decision on responsibility is needed. Do not publish or assign tasks.Sample output
“Technical accuracy, checking capacity and mobile readability are three separate themes. For each, the relevant check is open; the model did not accept responsibility on anyone's behalf.”
What did we get?
Independent human concerns did not dissolve into a single dominant view.
Hard
Situation
Taking precautions against every possibility can bloat the plan unnecessarily.
Prompt
Prompt
Plan: Deliver a local draft of a small announcement. Permission: Checking the text and sources; no publishing, new features or system changes.
Under the assumption of failure, generate at most five causes. Then keep only those that directly affect the requested delivery; leave poorly supported, out-of-scope scenarios in a separate short note.
For each cause kept, write a provable check and a stop criterion. Once the checks pass, do not open a new risk round. Do not produce real disaster forecasts or permission to expand the scope.Sample output
“A missing date, an unsupported claim and a broken internal link are direct checks. An unrelated system overhaul is not part of this delivery.”
What did we get?
The premortem stayed within the limits of the work instead of producing an endless list of precautions.
Where should you stop?
A premortem does not tell the future; probability ratios cannot be calculated without data. A red team can test a specific output or system with adversarial examples; a premortem generates causes from the assumption that the plan has failed. A proposed precaution is not permission to carry it out.
Sources
Pre-mortem Method of Risk Assessment (new tab) — Gary Klein. 2007 (method date stated; page publication date unknown). The primary practitioner source describing Gary Klein's premortem approach; the page's publication date is not verified, and the method's 2007 association is not turned into a page date. Evidence level: page body.

How this image was made
Original illustration made with Google Gemini · 1024 × 572
Generate an image: Create an original physically believable volumetric mineral sculpture photographed as a museum installation, horizontal 16:9. Deep anthracite void, porcelain mineral whites, restrained ice-blue and amber accents, fine structural particles, tactile surfaces, soft volumetric light, realistic depth and deliberate negative space. A future broken mineral bridge is shown as a faint translucent projection behind a solid intact bridge; small early cracks on the intact version are marked amber. No text, letters, numerals, logo, watermark, user interface, fake charts, identifiable people, or imitation of a particular artist. Depict the specified mechanism clearly; avoid generic clouds. One coherent original illustration.